Tag Archives: cryostat

Integration

After only a week in Wanaka we have unpacked our supplies, successfully tested the proper functionality of each detector, checked our electronics readout, collected low-energy calibration data with Am-241, Co-57, and Ba-133, calibrated our shields, started setting up our power … Continue reading

Posted in COSI 2020, Uncategorized | Tagged , , , | Comments Off on Integration

COSI 2020 Hits the Road: Driving the cryostat from Berkeley to CSBF

On January 5, 2020, Hadar, Nick, and I began our three-and-a-half day drive from Berkeley, CA to the Columbia Scientific Balloon Facility (CSBF) in Palestine, TX. While most of the COSI equipment traveled by truck and the rest of the … Continue reading

Posted in COSI 2020 | Tagged , , | Comments Off on COSI 2020 Hits the Road: Driving the cryostat from Berkeley to CSBF